\contentsline {table}{\numberline {1}{\ignorespaces Expected event rates}}{8} \contentsline {table}{\numberline {2}{\ignorespaces AGS Proton Driver Parameters.}}{59} \contentsline {table}{\numberline {3}{\ignorespaces General Parameters of the SCL.}}{60} \contentsline {table}{\numberline {4}{\ignorespaces Preliminary direct costs of upgrading the AGS to 1 MW. These costs do not include EDIA, contingency, and overheads.}}{61} \contentsline {table}{\numberline {5}{\ignorespaces Preliminary direct cost (FY02\$M) of building the neutrino beam with 200 meter decay tunnel. These costs do not include EDIA contingency, and overhead.}}{80}